TWS vs TWC: Roles, Responsibilities, and Who Signs Off What
TWS and TWC sound similar but carry very different sign-off authority under BS 5975. A clear breakdown of who's responsible for what, and why auditors care about the distinction.
TWS and TWC sound similar but carry very different sign-off authority under BS 5975. A clear breakdown of who's responsible for what, and why auditors care about the distinction.
If you've worked on a UK construction site with any temporary works — scaffolding, excavations, formwork, propping — you've likely come across the terms TWS and TWC. They sound similar, and their responsibilities overlap, but under BS 5975 they're distinct roles with different sign-off authority.
Temporary Works Coordinator (TWC)
The TWC sits at project level and is ultimately responsible for how temporary works are managed across the whole site. Core responsibilities:
Temporary Works Supervisor (TWS)
The TWS operates at the coalface — on the specific temporary works item itself. Core responsibilities:
Where the Overlap (and Confusion) Comes From
On smaller projects, the same person is sometimes both TWC and TWS — which is permitted, but blurs the line on independent checking. On larger or higher-risk projects, BS 5975 expects clear separation, so that design assurance (TWC) and site-level supervision (TWS) are genuinely independent of each other.
Quick Reference
| TWC | TWS | |
|---|---|---|
| Level | Project-wide | Individual item |
| Owns | The register, permits, design checks | Site inspections, day-to-day supervision |
| Reports to | Principal contractor | TWC |
Why This Matters for Compliance
Auditors and HSE inspectors will often ask directly: "who is your TWC?" and "who signed off this permit to load?" If the answer isn't immediate and the paper trail isn't clear, that's a red flag — regardless of whether the physical works are safe.
Making Sign-Off Traceable
Digital platforms like KaelSite assign these roles directly to team members, so every inspection, permit, and register entry is tied to the person who actually signed off on it — making the TWS/TWC split provable, not just theoretical.