Read articleConstruction calculator
Work out how much ready-mix you need for slabs, strip and pad foundations, trenches, footings and circular columns. Add a wastage allowance, estimate truck loads and optionally cost the pour.
Read the guide: Concrete Volume Calculator.
Free to use. No registration required.
From the blog
KaelSite
KaelSite’s construction catalog covers 20 project types, 596 work items, 2,345 inspection links and 310 shared inspection types, helping UK construction teams …
Read articleTemporary Work
Temporary works are hard to manage when registers, inspections, photos and actions are scattered across spreadsheets and emails. This guide explains what …
Read articleTemporary Work
BS 5975 is the British Standard code of practice for controlling temporary works. This guide explains the 2024 split into BS 5975-1 …
Read articleFor rectangular pours such as slabs, trenches, strip foundations and pads, multiply length × width × depth. Convert all dimensions to metres first so the result is in cubic metres (m³). For a circular column use π × (diameter ÷ 2)² × height.
Most site teams add 5–10% wastage for spillage, over-excavation and uneven grounds. Enter your own percentage in this calculator, the total volume includes that allowance so you can order enough material.
Divide the total volume including wastage by your mixer capacity (often around 6–8 m³). This calculator rounds up to whole truck loads so you do not under-order.
Yes. Enter a price per cubic metre and the tool multiplies it by the total volume including wastage. The figure is an estimate only and does not include labour, formwork, pumping, delivery surcharges or VAT unless those are already built into your unit price.
A slab is a broad horizontal pour (floor or ground-bearing slab). A strip foundation is a continuous trench pour under a wall. A pad foundation is an isolated rectangular pad under a column or pier. The volume maths is the same rectangular formula; the mode mainly changes the field labels and guidance for site use.
Enter the column diameter and height. Volume = π × radius² × height. If you are pouring several identical columns, set the quantity and the calculator scales the volume accordingly.