Read articleProductivity calculator
Estimate crew hours and labour cost from workers, hours per day, days and hourly rate. Add a work quantity to get cost per unit and productivity — with modes for bricklaying, excavation, concrete pouring and general labour.
Read the guide: Construction Cost and Labour Calculator.
Free to use. No registration required.
From the blog
KaelSite
KaelSite’s construction catalog covers 20 project types, 596 work items, 2,345 inspection links and 310 shared inspection types, helping UK construction teams …
Read articleTemporary Work
Temporary works are hard to manage when registers, inspections, photos and actions are scattered across spreadsheets and emails. This guide explains what …
Read articleTemporary Work
BS 5975 is the British Standard code of practice for controlling temporary works. This guide explains the 2024 split into BS 5975-1 …
Read articleMultiply number of workers × hours worked per day × days on the task. Example: 4 workers × 8 hours × 5 days = 160 labour hours.
Multiply total labour hours by the hourly labour cost. Using the example above at £25/hour: 160 × 25 = £4,000. Use an all-in rate if you want employer's NI, holiday and overheads included.
Divide total labour cost by the quantity completed (bricks, m³ excavated, m³ of concrete, or any other unit). It shows how much labour you spent for each unit of output, useful for comparing gangs or pricing extras.
Per worker-day = quantity ÷ (workers × days). Per labour-hour = quantity ÷ total labour hours. Both help you check whether a crew is matching expected site outputs for bricklaying, excavation or concrete pours.
The labour maths is the same; the mode changes the work-quantity label and guidance so you enter bricks (or m²), excavated m³ or poured m³ without mixing units. General labour uses a generic unit of work.
No; this calculator is for labour time and cost only. Add material and plant separately, or fold those costs into a higher hourly rate if you are approximating an all-in gang rate.